View Single Post
Old 09-13-2005, 07:00 PM   #13
GloryHound
Working on a Nova.
 
GloryHound's Avatar
 
Join Date: Nov 2002
Location: ##
Posts: 506
A swb frame was my problem also. Called a frame shop and they said it would cost $50 to hook it to the machine and $250 per pull. Also he said most frames require 3 pulls on average to straighten very few will be straight after one pull since a slight twist in addition to the bend makes pull #2 and then it is on to the second frame rail!
GloryHound is offline   Reply With Quote