Re: concerete guys step up
okay heres the deal looking at installing a lift in the shop at some point. cement company says i need rebar plus building codes require the fiber to be added to the cement and was quoted 1300 to pour and float the cement
Last edited by truckdude239; 03-22-2010 at 09:23 PM.
|