Re: norms 55 chevy pu build
Went through all my gas line fittings today and made sure they were clean, properly located and properly tightened up. I also removed the filter/regulator and made sure the paint was gone where it bolts on, also scraped paint off another place where I am going to ground wires, got to have really good grounds with LED lights, always want good grounds anyway. lol.
I put a piece of green tape on every fitting I checked and tightened as soon as I finished that particular one,That way I don't keep checking over and over. lol
I got my gas fill neck installed today and I ran a copper wire to ground the fill pipes to the frame so there is never a static charge.
Put in my gas gauge sender too.
I put in a few boards just to check to be sure all the hoses cleared.
I still have not decided what wheels to use, I think about it some every day.
|