Garage Building Woes

Well we moved to Florence OR and need to build another garage for the 54. Met with no less than 6 contractors and NONE have giving us an on paper bid. They don't even call back!! I think current wood and concrete costs are the reason. Local prices approaching $8 for a 2x4 and $200+ for a yard of 5 bag concrete. Permits are running 3-4 months as well, May go with a metal 2 car on gravel if things don't change soon!!
vintovka is offline   Reply With Quote
Old 10-31-2020, 01:18 PM   #2
mick53
Registered User
 
Join Date: Oct 2018
Location: Warsaw IN
Posts: 897
Re: Garage Building Woes

I have been a general contractor for about 40 years in a few states including California. A contractor can lock in a price months in advance by paying for it an taking delivery later. The reason most contractors don't want to do this is they hope the price will go down. I have also given bids for projects that don't start for a while with provisional material cost. This protects the customer and the contractor. Also upon winning the bid I have had customers pay the entire material cost to lock it in. I now do projects in the 15-50 million dollar range but it applied when I was doing small residential also. Getting a price on a job that is not yet permitted is looked at by the contractor as possible waisted time. The bids may be free for you but they cost time and money for the contractor. In an industry where the average win ratio is about 10% that counts. My advice is get your permit and then call 3 contractors with good reputations. You will be surprised how close the bids are. Always read the contract carefully an see what is and is not included. Never sigh a vague contract that is not itemized with a completion date. Just my $.02 worth. Thank you for your time.
mick53 is offline   Reply With Quote
Old 10-31-2020, 01:28 PM   #3
joedoh
Senior Member
 
joedoh's Avatar
 
Join Date: May 2007
Location: Doodah Kansas
Posts: 7,774
Re: Garage Building Woes

these days everyone is a general contractor, and they blow through subs by not paying them till 90 net or sometimes at all. remember the contractor is just your interface, if you have the budget and time, read up on project scheduling and county codes for inspections and just hire the subs yourself.

my last contractor told me his problems were being exacerbated by my unwillingness to pay milestone payments even though he hadnt hit the milestones. it was baffling, it was MY fault he couldnt do the milestone work I was being asked to pay in advance for instead of after completion, because he had spent the 25% deposit I gave him on materials for another job. he said thats how it works, the current starting job pays to finish the last job!

at the end I had to withhold the final payment in case subs came after him, and sure enough, concrete (supposed to be paid in first installment!) put a lien warning and we ended up paying drywall and plumbing subs out of the balance because he planned to pay them 90 net (and probably stiff them outright!). This was after he used the electrical allowance to pay the electrician $85/hr to stand and pump rainwater from the basement so the floor could be poured, I took the county test and did the electrical myself.
__________________
the mass of men live lives of quiet desperation


if there is a problem, I can have it.

new project WAYNE http://67-72chevytrucks.com/vboard/s...d.php?t=844393
joedoh is offline   Reply With Quote
Old 10-31-2020, 02:22 PM   #4
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

The local lumber supplier told the tale. Mills are closed and contractors are basically bidding on what little is available. Asia is sucking up all the raw logs they can right now. The log piles and sawdust mountains are a sight to see in the ports.

Built a nice 24x30 Garage two years ago, with the works, for 23K. That's where the 54 will stay until spring. One contractors said he couldn't do it for less than 55K right now. Now really Looking hard at Metal Garage on gravel. Just worried about condensation dripping all over.
vintovka is offline   Reply With Quote
Old 10-31-2020, 08:03 PM   #5
mick53
Registered User
 
Join Date: Oct 2018
Location: Warsaw IN
Posts: 897
Re: Garage Building Woes

Quote:
Originally Posted by vintovka View Post
The local lumber supplier told the tale. Mills are closed and contractors are basically bidding on what little is available. Asia is sucking up all the raw logs they can right now. The log piles and sawdust mountains are a sight to see in the ports.

Built a nice 24x30 Garage two years ago, with the works, for 23K. That's where the 54 will stay until spring. One contractors said he couldn't do it for less than 55K right now. Now really Looking hard at Metal Garage on gravel. Just worried about condensation dripping all over.
If you put a thermal break there like vinyl backed rolled insulation you won't get condensation.
mick53 is offline   Reply With Quote
Old 11-01-2020, 05:12 PM   #6
_Ogre
Registered User
 
_Ogre's Avatar
 
Join Date: Jan 2012
Location: Motown
Posts: 7,680
Re: Garage Building Woes

Quote:
Originally Posted by vintovka View Post
Local prices approaching $8 for a 2x4
stupid crazy prices! i'm helping my son in law gut a bathroom with 9 foot ceilings
a freaking 2x4x10 is over $10 each, we stripped the ceiling with 1x4s that cost what a 2x4 would have 5 years ago
the bathroom vanity is over $800 for mdf cabinets
__________________
cool, an ogre smiley Ogre's 58 Truk build

how to put your truck year and build thread into your signature
shop air compressor timer
_Ogre is offline   Reply With Quote
Old 11-02-2020, 11:18 PM   #7
62c30
Registered User
 
Join Date: Jan 2017
Location: Derby Kansas
Posts: 386
Re: Garage Building Woes

I built a 30x40 garage this spring and had been collecting materials for the prior 6 months. Other than the concrete I did it all myself. I would buy when I found a deal. I have about $9,000 in the building not including concrete and that is with 2x6 studs. I did a rough estimate the other day after seeing how much lumber and osb ($22!!) went up and it would cost about 50% more now vs back in the spring.
62c30 is offline   Reply With Quote
Old 11-05-2020, 09:20 PM   #8
notsolo
Registered User
 
notsolo's Avatar
 
Join Date: Apr 2008
Location: Md
Posts: 2,482
Re: Garage Building Woes

Quote:
Originally Posted by vintovka View Post
The local lumber supplier told the tale. Mills are closed and contractors are basically bidding on what little is available. Asia is sucking up all the raw logs they can right now. The log piles and sawdust mountains are a sight to see in the ports.

Built a nice 24x30 Garage two years ago, with the works, for 23K. That's where the 54 will stay until spring. One contractors said he couldn't do it for less than 55K right now. Now really Looking hard at Metal Garage on gravel. Just worried about condensation dripping all over.
We put up an American steel Quonset building 15 yrs ago...We get a lot of moisture overnight.. yes some condensation. Really not bad overall. It could be reduced or eliminated if you added synthetic roofing paper on the inside. $150 for 1000sq ft roll...3 rolls would cover inside 24x40...
notsolo is offline   Reply With Quote
Old 11-05-2020, 10:09 PM   #9
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

Quote:
Originally Posted by notsolo View Post
We put up an American steel Quonset building 15 yrs ago...We get a lot of moisture overnight.. yes some condensation. Really not bad overall. It could be reduced or eliminated if you added synthetic roofing paper on the inside. $150 for 1000sq ft roll...3 rolls would cover inside 24x40...
Curious do you know your average humidity and how did you attach the paper?

Building here has come to a screeching halt and operating mills and raw logs all Asia bound. We get 70=99% humidity due to being yards from ocean and feet from big river.
vintovka is offline   Reply With Quote
Old 11-05-2020, 10:33 PM   #10
mongocanfly
Post Whore

 
mongocanfly's Avatar
 
Join Date: May 2015
Location: Alabama
Posts: 14,671
Re: Garage Building Woes

A guy I work with had his house condemned..he had 90 days to get out..he got a material bid for 90k for his new house...30 days later it was 127k...its crazy right now...
here, 2 weeks ago ,2x4s are $8 ,osb is $23...a 4×4×10 are $24 each..
I'd hate to be having to build right now..and I was..
I got my foundation done and throwed the brakes on my house build...itll have to wait
__________________
Mongo...aka Greg

RIP Dad
RIP Jesse

1981 C30 LQ9 NV4500..http://67-72chevytrucks.com/vboard/s...d.php?t=753598
Mongos AD- LS3 TR6060...http://67-72chevytrucks.com/vboard/s...34#post8522334
Columbus..the 1957 IH 4x4...http://67-72chevytrucks.com/vboard/s...63#post8082563
2023 Chevy Z71..daily driver
mongocanfly is offline   Reply With Quote
Old 11-06-2020, 12:23 AM   #11
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

This cannot continue or contractors and material suppliers may go bust. Existing Home prices are up a good 10% here and soaring in large part do cause nobody in building. The place we just bought in March is up 20%+ today. Watch rents and food go nuts. All of this means everything else will too. including auto restoration parts and labor. Thank you to the left and china.

Last edited by vintovka; 11-06-2020 at 10:52 AM.
vintovka is offline   Reply With Quote
Old 11-06-2020, 08:38 AM   #12
notsolo
Registered User
 
notsolo's Avatar
 
Join Date: Apr 2008
Location: Md
Posts: 2,482
Re: Garage Building Woes

Had to look up the average, looks like 85%....as far as attaching synthetic roofing, 4 strips on the 4 ft lengths on each, held by the bolts....and bead of polyurethane caulk on other ribs. This was all nut and bolt U shaped panels, bolt a ring together on the ground and stand it up...the panels on the ends are 24" roofing galv-alum.......synthetic roofing I use is called Titanium UDL. 30.
notsolo is offline   Reply With Quote
Old 11-06-2020, 01:09 PM   #13
layinrocker65
Registered User
 
layinrocker65's Avatar
 
Join Date: Jun 2005
Location: California
Posts: 521
Re: Garage Building Woes

You have to be careful. Contractors are building houses like crazy where Im at since we lost thousands of houses in the CA fires. The contractors are taking all the money, buying themselves all new $90k lifted trucks and new tools with the money to build the houses. Then they walk away from the jobs before they are done because they ran out of money. Luckily for most of these home owners, insurance is coving most of it.

They are beyond paying for the current project with the next projects money.
__________________
‘53 GMC COE stock
‘53 Chevy 3100 LSA/TR6060 http://67-72chevytrucks.com/vboard/s....php?t=805949‘
'70 Chevy C10 LWB 350/sm465
‘74 Chevy C10 SWB 5.3/4L80e, Vintage Air, Dakota Digital, US Mags
layinrocker65 is offline   Reply With Quote
Old 11-06-2020, 02:27 PM   #14
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

Quote:
Originally Posted by layinrocker65 View Post
You have to be careful. Contractors are building houses like crazy where Im at since we lost thousands of houses in the CA fires. The contractors are taking all the money, buying themselves all new $90k lifted trucks and new tools with the money to build the houses. Then they walk away from the jobs before they are done because they ran out of money. Luckily for most of these home owners, insurance is coving most of it.

They are beyond paying for the current project with the next projects money.
We left CA as i saw this coming after my time working with CA Dept of Insurance. The real big guys (like the swiss reinsurance group) who back up/cover the American insurance companies may have to to pull plug on them due to losses. Even Lloyds of London has, or is in the process of, bailing. AAA and many others are already gone leaving the near bankrupt CA "fair plan" as a last resort. No Insurance? No Loans. A cancellation notice in your mailbox may cost you the value of your home.
vintovka is offline   Reply With Quote
Old 11-08-2020, 12:07 AM   #15
G&R's57GMC
Senior Member
 
G&R's57GMC's Avatar
 
Join Date: Aug 2010
Location: Shasta Lake, CA.
Posts: 1,624
Re: Garage Building Woes

Being that you’re so close to the ocean and river steel is not the way to go .

We looked at a 2 year old development on the Oregon coast and all the steel garage doors , flashing and anything else made of steel including nails was already rusted. My guess is they would have to be replaced at 5 years. They should have used stainless nails . Copper flashing and composite garage doors .
The windows facing the ocean were etched by the salt air .

Just something to think about .
__________________
Glen & Jane's Rides
‘57 GMC NAPCO Long Bed V8 4 speed Bought 2008
7 other cars & trucks , 5 trailers
'56 Chevy Long Bed I6, 4 speed Bought 1990 Sold 8.22.2020
’56 GMC Suburban Pickup V8, 4 speed Hydramatic Bought 1996 Sold 10.11.2020
My Other Tinkerings http://67-72chevytrucks.com/vboard/s...75#post8967275

Last edited by G&R's57GMC; 11-08-2020 at 12:13 AM.
G&R's57GMC is offline   Reply With Quote
Old 11-08-2020, 12:51 AM   #16
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

Quote:
Originally Posted by G&R's5MC View Post
Being that you’re so close to the ocean and river steel is not the way to go .

We looked at a 2 year old development on the Oregon coast and all the steel garage doors , flashing and anything else made of steel including nails was already rusted. My guess is they would have to be replaced at 5 years. They should have used stainless nails . Copper flashing and composite garage doors .
The windows facing the ocean were etched by the salt air .

Just something to think about .
Yes, steel is NOT my first choice but unless you are like within 2-300 feet from the waves most well treated steel seems to hold up. Down near our other place on the beach most steel buildings/carports are doing ok. Salt spray is hell on things like heat pumps and raw steel. Have till spring to decide and raining like 6" an hour right now and civil war seems imminent, so building is out of the question.
vintovka is offline   Reply With Quote
Old 11-08-2020, 11:19 PM   #17
burnin oil
Registered User
 
Join Date: Jan 2013
Location: Eastern TN
Posts: 1,921
Re: Garage Building Woes

I am redoing my roof right now and thank goodness I bought the material right as prices started to rise. Cost me like an extra $200 so I can't complain. I was supposed to be building my shop this year but got side tracked while clearing out the land. I am comptamplating just buying a cheap portable saw mill for under 4k and a planner and just drop a bunch of pine trees on the property. Seems cheaper than buying lumber if it doesn't go back down in the future. My time and labor is free so who knows at this point.
burnin oil is offline   Reply With Quote
Old 11-10-2020, 03:31 PM   #18
mick53
Registered User
 
Join Date: Oct 2018
Location: Warsaw IN
Posts: 897
Re: Garage Building Woes

Material always goes up during hurricane season and this has been a bad one. Then add the wildfires. Supply and demand. It will come down in the spring.
mick53 is offline   Reply With Quote
Old 11-10-2020, 03:49 PM   #19
vintovka
Registered User
 
vintovka's Avatar
 
Join Date: Aug 2016
Location: Hunkered Down
Posts: 1,895
Re: Garage Building Woes

The talk about open conflict here aren't helping. Gunshops are empty and many are carrying.

Getting estimates from metal guys now. May have to settle for gravel now and have concrete floor done when sanity returns.
vintovka is offline   Reply With Quote
Old 11-11-2020, 02:00 PM   #20
_Ogre
Registered User
 
_Ogre's Avatar
 
Join Date: Jan 2012
Location: Motown
Posts: 7,680
Re: Garage Building Woes

Quote:
Originally Posted by vintovka View Post
when sanity returns.
1/20/21
__________________
cool, an ogre smiley Ogre's 58 Truk build

how to put your truck year and build thread into your signature
shop air compressor timer
_Ogre is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com