![]() |
Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
![]() |
#1 |
Senior Member
Join Date: Jul 2001
Location: Muskegon,MI,USA
Posts: 6,026
|
1972 Suburban progress update
My son's 72 Suburban has been apart since 2001 and after much work, it is going back together. It took almost the whole month of October to paint the
body and parts. November was spent refreshing the frame and running gear which was originally completed in December of 2001. On December the 2nd we removed the body from the spare frame, (used for moving the body during the painting) and set it on the finished frame. I took some pictures of the installation which are attached to this posting. Pic 1 is the frame assembly. Pic 2 is the body suspended ready for rolling the frame to go under it. Pic 3 is the frame starting under the body. Pic 4 is the body on the frame. We are shooting for completion by spring of 07. Jim |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|