11-03-2009, 11:30 PM | #11 |
1 thing at a time is progress.
Join Date: Jun 2007
Location: Ball Ground GA
Posts: 5,511
|
Re: Project Vitamin C-10
Called the lumber place they want $5.75/bdft for babinga (sp) and $2.10/bdft for red oak.
Spread some filler today. I put the wheel tub in too stabilize the panels. I will be putting a gusset of some kind in this area. It looks like a good place for a crack to form.
__________________
Alan
Philippians 2:14-16 |
Bookmarks |
Tags |
1959, 1960, 1964, 1965, 1966, c10, hugger, impala, orange |
Thread Tools | |
Display Modes | |
|
|