![]() |
Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
![]() |
#1 |
Registered User
![]() Join Date: Nov 2007
Location: Turlock California 95380
Posts: 2,075
|
My latest master shower project
Attachment 616090I tend to tell long stories, so I will just say this is my latest project for some customers of mine. They bought a house with a one piece fiberglass tub that was cracked about 8 inches long next to the drain so I tore it out and have been slowly working on it as time permits... some of these pics are cell phone pics
![]() I presloped the floor for the shower pan.. I replaced the shower valve.. and the shower head had to go up about 16"
__________________
72 C20 Longbed 05 1500 Z71 Last edited by sleepertruck72; 07-31-2010 at 12:57 AM. |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|