The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > General Truck Forums > Suspension

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-25-2006, 07:11 PM   #1
jimmydean
Registered User
 
jimmydean's Avatar
 
Join Date: May 2005
Location: Beaverton, OR
Posts: 3,728
The front is done!

Ok, so it took 2 months, but the front is done! I have everything for the back and if it's not raining I will start (with hopes to finish) tomorrow. I have a lot of vacation time next month as well, so I'm not too worried. It it under pressure now waiting to see if I have any leaks. I will add a second compressor for sure now because the tank takes what seems like forever.

1/2" valves + 1/2" lines = carnival ride fast!

here are a couple shots.

tank location:


compressor location:


up:


down:


I did not trim the cups on the front and I might when I install the new upper arms next month. I didn't want it to be too low to drive in case I loose pressure or something. I think it could be an inch lower without issue, but I will know when the back is all done.
jimmydean is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 01:32 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com