The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1960 - 1966 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-17-2009, 12:45 AM   #1
ol Curt
Junior Member
 
ol Curt's Avatar
 
Join Date: Dec 2006
Location: Newburgh, IN
Posts: 1,247
Minor progress in prep for floor work

I got my fuel tank out today. Man I thought it was about empty, and about 15 gallons later, it was!! Do you know how long it takes to drain that much thru that little line? I got my parts for the drivers side.

They were inspected and passed by Gus and Jasmine.
Name:  Jasmind and Gus inspecting TriPlus part.jpg
Views: 127
Size:  73.0 KB



The kick panel patch will definitely be needed.
Name:  Bottom of kick panel.jpg
Views: 129
Size:  35.9 KB


I asked dad if he wore any shoes out before shooting the sheet metal screw to hold the floor together. He didn't find it as funny as I did!
Name:  Dood thing I didn't fall thru.jpg
Views: 124
Size:  80.6 KB

Tomorrow, I'll begin doing some cutting.
ol Curt is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:32 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com