Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
01-17-2009, 12:45 AM | #1 |
Junior Member
Join Date: Dec 2006
Location: Newburgh, IN
Posts: 1,247
|
Minor progress in prep for floor work
I got my fuel tank out today. Man I thought it was about empty, and about 15 gallons later, it was!! Do you know how long it takes to drain that much thru that little line? I got my parts for the drivers side.
They were inspected and passed by Gus and Jasmine. The kick panel patch will definitely be needed. I asked dad if he wore any shoes out before shooting the sheet metal screw to hold the floor together. He didn't find it as funny as I did! Tomorrow, I'll begin doing some cutting. |
Bookmarks |
|
|