Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
02-21-2009, 02:36 AM | #11 | ||
Registered User
Join Date: Nov 2008
Location: Windsor, CA
Posts: 500
|
Re: Not so budget 3-link build
Quote:
Quote:
Here's some from when I was building it. I capped the front of the rails where they transition into the stock frame. Here you can see I cut two 1" holes on each side of the frame where another cross member will go. Now the cross member in place, and the initial pressure test of 120 PSI. I let it sit for 3 days to see if it would leak down over time. It's all TIG welded, and I didn't find any leaks. Over 3 days it lost 2 PSI. I figure it was either in a fitting, the schraeder valve, the gauge, or a pinhole too small to detect. I later tested it to 200 PSI and let it sit for about 20 hours with no change in pressure. Here's that cross member. I spaced the ports out so that the valves van be mounted to the frame. And a last shot of it installed.
__________________
If you can find it cheaper, I can fix it! |
||
Bookmarks |
|
|