|
04-13-2005, 03:16 AM | #1 |
Project 2 Resume
Join Date: May 2004
Location: Jim Thorpe, PA
Posts: 884
|
I know a lot of people say just swap chassis' but I still think that's not the easiest way to go. To me anyway. I was looking again through a jy last week. Since the holes are already there, still looks easier to just take off nose, suspend motor, swap crossmember, steering box & shaft and spring mounts, etc. Regardless of how many rivets to remove. Then deal with tc and drive shafts. Most definately the way I'm probably going to do it and use a 91 grille & rad support setup while apart. Personally, I'd rather clip the chassis behind the leafs than swap chassis'. But I've done clip jobs before.
Gabe you can always try searching the boards.
__________________
John 1984 C30 Chevy Crew Cab Dually 1998 Jeep Cherokee 4x4 2004 Chevy Trailblazer 4x4 (wife's) 1970 Mustang FB fully tubed (getting 521 BBF & powerglide) 1978 Nova 2dr (going BBCaddy & S.P. th400) 1984 Monte SS (circle track car) |
Bookmarks |
|
|